After notifying the UTC, how long before you may begin operating on 630 m or 2200 m?

30 days, unless UTC reports a nearby power line carrier system.

Start playing free

  1. After 24 hours
  2. After 90 days
  3. After 30 days, unless UTC flags a nearby PLC system ✔

Why: Rule 97.303(g) requires notifying the Utilities Telecom Council (now the Utilities Technology Council). You may start after 30 days unless UTC says you are within 1 km of a power line carrier system.

Huh, didn't know that: Stations on 2200 m and 630 m may operate only from fixed locations, at least 1 km horizontally from power lines carrying PLC signals on those bands.

The dad joke
What do you call London without electricity? Londoff.
Like this card?
Play the game

References

Answer: After 30 days, unless UTC flags a nearby PLC system. Rule 97.303(g) requires notifying the Utilities Telecom Council (now the Utilities Technology Council). You may start after 30 days unless UTC says you are within 1 km of a power line carrier system.

  1. 47 CFR 97.303 Frequency sharing requirements (Cornell LII mirror of eCFR) www.law.cornell.edu/cfr/text/47/97.303
    permitted to commence operations after the 30-day period
    Checked 2026-10-11.
  2. 47 CFR 97.303 Frequency sharing requirements (Cornell LII mirror of eCFR) www.law.cornell.edu/cfr/text/47/97.303
    shall notify the Utilities Telecom Council (UTC)
    Checked 2026-10-11.
  3. 47 CFR 97.303 Frequency sharing requirements (Cornell LII mirror of eCFR) www.law.cornell.edu/cfr/text/47/97.303
    shall only operate at fixed locations
    Checked 2026-10-11.

Think this answer is wrong? Tap "Challenge this answer" on the card in the game and tell us why.

Test yourself in the game