On a construction site, what must be done to deenergized circuits before work?
Make them inoperative and tag them wherever they could be energized.
- Turn off one switch and tell the crew
- Make them inoperative and tag every energizing point ✔
- Post one sign at the job trailer
Why: 1926.417(b) says deenergized equipment or circuits must be made inoperative, with tags at all points where they could be energized.
Huh, didn't know that: Tags must plainly identify the equipment or circuits being worked on.
Why did the controls get locked out? They were tired of surprise starts.
Like this card?
References
Answer: Make them inoperative and tag every energizing point. 1926.417(b) says deenergized equipment or circuits must be made inoperative, with tags at all points where they could be energized.
- 29 CFR 1926.417(b) www.law.cornell.edu/cfr/text/29/1926.417
Equipment or circuits that are deenergized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized.
Checked 2026-10-10.
Think this answer is wrong? Tap "Challenge this answer" on the card in the game and tell us why.
More stuff everyone should know
Safety & First AidWhat protects workers using 120-volt temporary receptacles on construction sites?Safety & First AidWhat alternative to GFCI protection is allowed for construction site receptacle outlets?Safety & First AidWhat should happen with worn or frayed electric cords on a construction site?
That's stuff everyone should know.