On a construction site, what must be done to deenergized circuits before work?

Make them inoperative and tag them wherever they could be energized.

Start playing free

  1. Turn off one switch and tell the crew
  2. Make them inoperative and tag every energizing point ✔
  3. Post one sign at the job trailer

Why: 1926.417(b) says deenergized equipment or circuits must be made inoperative, with tags at all points where they could be energized.

Huh, didn't know that: Tags must plainly identify the equipment or circuits being worked on.

The dad joke
Why did the controls get locked out? They were tired of surprise starts.
Like this card?
Play the game

References

Answer: Make them inoperative and tag every energizing point. 1926.417(b) says deenergized equipment or circuits must be made inoperative, with tags at all points where they could be energized.

  1. 29 CFR 1926.417(b) www.law.cornell.edu/cfr/text/29/1926.417
    Equipment or circuits that are deenergized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized.