Once permits are done, how long does DOE say the physical PV installation generally takes?
Generally only a few days.
- Several months
- About a year
- Only a few days ✔
Why: The long waits come from design, permits and utility approval. The crew work itself on a typical home is short.
Huh, didn't know that: DOE says permits and inspections can take weeks to months.
I have this great construction joke, but I'm still working on it.
Like this card?
References
Answer: Only a few days. The long waits come from design, permits and utility approval. The crew work itself on a typical home is short.
- DOE: Step-by-Step Guide for Consumers Going Solar www.energy.gov/eere/solar/articles/walk-me-through-it-step-step-guide-consumers-going-solar
The PV system installation generally takes only a few days
Checked 2026-10-10. - DOE: Walk Me Through It www.energy.gov/eere/solar/articles/walk-me-through-it-step-step-guide-consumers-going-solar
The National Renewable Energy Laboratory's SolarTRACE tool can give you an idea of how long it may take
Checked 2026-10-10.
Think this answer is wrong? Tap "Challenge this answer" on the card in the game and tell us why.
More stuff everyone should know
That's stuff everyone should know.